Doctoral Supervisor
The Last Update Time: ..
Release time:2024-04-10 Hits:
Translation or Not:no
Pre One:M. Wu, J. H. She, M. Nakano, W. H. Gui. Expert control and fault diagnosis of the leaching process in a zinc hydrometallurgy plant. Control Engineering Practice, 2002, 10 (4): 433-442.
Next One:M. Wu, J. H. She, M. Nakano. An expert control system using neural networks for the electrolytic process in zinc hydrometallurgy. Engineering Applications of Artificial Intelligence, 2001, 14 (5): 589-598.