S. Yang and D. Wang. A new adaptive neural network and heuristics hybrid approach for job-shop scheduling. Computers and Operations Research, 28(10): 955-971, September 2001. Elsevier Science Ltd (DOI: 10.1016/S0305-0548(00)00018-6 and PDF File).
点击量 :
是否译文 : 否
上一条: S. Yang and D. Wang. Constraint satisfaction adaptive neural network and heuristics combined approaches for generalized job-shop scheduling. IEEE Transactions on Neural Networks, 11(2): 474-486, March 2000. IEEE Press (DOI: 10.1109/72.839016 and PDF File).
下一条: S. Yang. Adaptive group mutation for tackling deception in genetic search. WSEAS Transactions on Systems, 3(1): 107-112, January 2004 (PDF File).