- [31]Gong, W., Huang, H., Juang, C.H.*, and Wang, L. (2017). “Simplified-robust geotechnical design of soldier pile-anchor tieback shoring system for deep excavation.” Marine Georesources & Geotechnology, 35(2), 157-169.
- [32]Juang, C.H., Gong, W.*, and Martin II, J.R. (2017). “Subdomain sampling methods-Efficient algorithm for estimating failure probability.” Structural Safety, 66, 62-73.
- [33]Gong, W., Juang, C.H.*, and Martin II, J.R. (2016). “Numerical integration method for computing reliability index of geotechnical system.” Georisk: Assessment and Management of Risk for Engineered Systems and Geohazards, 10(2), 109-120.
- [34]Gong, W., Juang, C.H.*, Khoshnevisan, S., and Phoon, K.K. (2016). “R-LRFD: Load and resistance factor design considering robustness.” Computers and Geotechnics, 74, 74-87.
- [35]Gong, W., Juang, C.H.*, Martin II, J.R., and Ching, J. (2016). “New sampling method and procedures for estimating failure probability.” Journal of Engineering Mechanics, 142(4), 04015107.
- [36]Gong, W., Tien, Y.M., Juang, C.H.*, Martin II, J.R., and Zhang, J. (2016). “Calibration of empirical models considering model fidelity and model robustness-focusing on predictions of liquefaction-induced settlements.” Engineering Geology, 203, 168-177.
- [37]Xiao, J., Gong, W.*, Martin II, J.R., Shen, M., and Luo, Z. (2016). “Probabilistic seismic stability analysis of slope at a given site in a specified exposure time.” Engineering Geology, 212, 53-62.
- [38]Gong, W., Juang, C.H.*, Huang, H., Zhang, J., and Luo, Z. (2015). “Improved analytical model for circumferential behavior of jointed shield tunnels considering the longitudinal differential settlement.” Tunnelling and Underground Space Technology, 45, 153-165.
- [39]Gong, W., Wang, L., Khoshnevisan, S., Juang, C.H.*, Huang, H., and Zhang, J. (2015). “Robust geotechnical design of earth slopes using fuzzy sets.” Journal of Geotechnical and Geoenvironmental Engineering, 141(1), 04014084.
- [40]Gong, W., Huang, H., Juang, C.H.*, Atamturktur, S., and Brownlow, A. (2015). “Improved shield tunnel design methodology incorporating design robustness.” Canadian Geotechnical Journal, 52(10), 1575-1591.
